Cut on stone. Wired to the letter. Hung by the makers.
Every NAVERZIX fixture begins on Bohemian cutting wheels and ends with our own electricians levelling it under your ceiling. Between the two: brass cast and chased in the metal shop, glass blown and annealed overnight, wiring tested to EN 60598 — and a burn-in evening before anything is crated.
One contract, one schedule, one responsible person. The packaging leaves with the crew; the protocol and photometric card stay with you.